I have JD SF-RTK with Gen 4 monitor and implement guidance on both the planter and the strip till rig. What is the easiest way to shift all my guidance lines 7.5" or 15" from the spring planter pass to the fall strip-till pass so that I strip between the rows? Then also to make that pass the new track/path to plant into next spring? This would include both the Boundary Tracks and straight tracks