Eastern NC | I have MTG 4G's in all my Greenstar ready equipment. That allows me to "send setup files" to my equipment. GS 3 (2630) can't accept the "normal" Op-center send file, but there's another send files option (if you set the files as for 2630). Its under the "more" tab, Files (upload, download, assign & send files to machine.
If you don't have MTG's then you can use a thumb drive to load the same "set-up file" from opcenter on a computer. I don't think you can send setup files on a mobile device.
"Work Planer" doesn't function for 2630's like it does for Gen 4/5 displays. Use setup file creator and ignore the Deere suggestion to "try work planer"
I have not run any Gen 4 or 5 stuff yet, so I don't know much about them. The 2630's do a great job for me so far. One more note, I don't know of any way to add a field or such from opcenter (single add on). You have to install a whole new Set-up File with all that you want on it. | |
|