AgTalk Home
AgTalk Home
Search Forums | Classifieds (2) | Skins | Language
You are logged in as a guest. ( logon | register )

Question for those who've installed an Ag Leader yield Monitor on a JD 9500
View previous thread :: View next thread
   Forums List -> Precision TalkMessage format
 
Nate B.
Posted 9/12/2024 12:44 (#10887930)
Subject: Question for those who've installed an Ag Leader yield Monitor on a JD 9500



Bremen, KS
Specifically, how did you route the CAN Bus cable into the grain tank to connect to the flow sensor?

I have the large clean grain elevator belt shields off as I needed to replace the upper sprocket and bearings. Looking at things, I am considering running the cable along the elevator chain adjustment rod which isn't used for adjustment any longer and then over toward the flow sensor. In doing so I would cut a hole in the larger of the two shields to pass the cable through and seal it up with a provided grommet and silicone. I think this would be better than poking a hole through the bottom of the grain tank.

Edited by Nate B. 9/12/2024 12:44
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)